 |
1.
Spa leaking water due to cracked bond beam. |
 |
2.
Excessive calcium scaling on waterfall before scale removal. |
 |
3.
Pool prior to renovation. |
 |
4.
Pool/Spa prior to renovation. |
 |
5.
Removed existing coping and tile, reset new tile. |
 |
6.
Removed coping and tile from spa to repair broken bond beam. |
 |
7.
Installation of new tile. |
 |
8.
Preparation to repair broken bond beam. |
 |
9.
Installing new flagstone coping on spa. |
 |
10.
Installing new flagstone coping on pool. |
 |
11.
Installing flagstone facing around outside of
spa. |
 |
12.
Repair spa prior to cleanup. |
 |
13.
Increased size of steps for easier access. |
 |
14.
Preparation of pool to receive new plaster. |
 |
15.
Saw cut deck across back of house to install
gas line for fire pit and additional deck drains. |
 |
16.
Additional deck drains and gas line installed. |
 |
17.
Saw cut deck for fire pit installation. |
 |
18.
Gas line and fire ring installed for fire pit. |
 |
19.
Deck prepared to accept new spray deck topping. |
 |
20.
Construction of fire pit |
 |
21.
Additional sidewalk poured from pool around to
driveway. |
 |
22.
Completed fire pit. |
 |
23.
Installation of Hydrazzo Pacific Blue plaster. |
 |
24.
Installation of Hydrazzo Pacific Blue plaster. |
 |
25.
Plaster installation complete. |
 |
26.
Plaster installation complete. |
 |
27.
Spray deck installation. |
 |
28.
Moss rock borders installed around flower beds. |
 |
29.Completed spa renovation. |
 |
30.
Completed pool renovation. |
 |
31.
Completed pool renovation. |
 |
32.
Completed pool renovation. |
 |
33.
Cushion made for top of fire pit. |
|
|